Has BIM Modified MEP Design Workflow?

The MEP design and set up workflow includes plenty of stakeholders and events which are collectively accountable for overseeing a collection of phases that can outcome within the constructing engineering (or constructing services) to be deliberate, designed, spatially coordinated, fabricated, put in, commissioned and maintained. Usually, the constructing services design stage follows the preliminary architectural design, from which level it could possibly often be designed in parallel with additional architectural in addition to structural design adjustments.

The engineering groups that usually design constructing services options are often in one in every of two teams. The primary group is usually the constructing designer, often known as the advisor engineer or the design engineer. It’s the position of the design engineer to work intently with the architect to develop the general constructing engineering parts together with lighting, cooling, heating, drainage, waste, fireplace prevention and safety services. Historically, the design engineer won’t be concerned within the detailed spatial design of those services. As a substitute the detailed spatial design and set up would usually be dealt with by the second social gathering, referred to as the MEP contractor (M&E contractor) or trade contractor. The MEP or trade contractor is accountable for evolving the preliminary advisor design right into a workable and installation-ready constructing services resolution.

In some cases, there’s additionally a third social gathering concerned – the fabricator, who might be accountable for creating MEP parts corresponding to ductwork or pipework parts or in some circumstances pre-fabricated options that encompass pipework, electrical ladder, plumbing, ductwork and sprinkler inside a body (module) that’s delivered to website for set up in risers, plant rooms and corridors.

This text is anxious with the position of the MEP designer and MEP contractor, particularly, the main target for this text is to debate how BIM (Constructing Data Modelling) has influenced the MEP design workflow between the designer and the contractor.

Present MEP BIM Workflow Choices

Basically there are 5 totally different MEP design workflow eventualities that at present exist and these might be mentioned within the article. They’re as follows

 

  1. Conventional 2D design and 3D BIM coordination
  2. 3D MEP design and 3D BIM coordination
  3. Designers 3D BIM design and coordination
  4. Contractor 3D BIM design and coordination
  5. Normal contractor 3D model coordination

 

Conventional 2D Design and 3D BIM Coordination

Contemplating the standard MEP method first, that is the place a advisor will create 2D design outputs, which embody 2D plan layouts, 2D sections and MEP (M&E) schematics. This can point out the design intent for the constructing primarily based on the use specified by the architect. As soon as the advisor has accomplished this design info he’ll move on the knowledge to an MEP contractor who might be accountable for creating the MEP coordinated resolution. This text assumes that the contractor will create a spatially coordinated 3D BIM model utilizing BIM instruments corresponding to Revit MEP and Navisworks. The contractor will use the design info and create an installation-ready resolution which takes under consideration set up, effectivity of pipe runs or duct bends, house for lagging and hanging the services, entry for publish set up upkeep and so forth. This conventional MEP method, from a 2D design to a 3D model has existed for the previous couple of many years and permits the contractor so as to add further info into the model that can be utilized by him and by amenities management firms after the set up. The usage of the 3D tool corresponding to Revit is after all helpful as it’s an clever model, with parametric parts and subsequently, in addition to permitting the contractor to determine and resolve clashes earlier than any time is spent on website, it has different makes use of and functions the place model ‘info’ is used and relied upon.

3D MEP Design and 3D BIM Coordination

The second workflow technique is extra immediately influenced by BIM. Because the MEP designer, one will use BIM instruments to create a 3D model and related drawings throughout his preliminary design part (slightly than a 2D design) earlier than this info is handed throughout to an MEP trade contractor. The MEP design engineer will usually create a 3D model attributable to buyer specs and necessities for a BIM model, as in lots of circumstances a federated model (which mixes the opposite disciplines in a single model) is required by the consumer for a weekly overview and therefore the MEP advisor can not merely present a set of 2D drawings. On this workflow, the BIM model is successfully a 3D illustration of what would in any other case be a 2D deliverable. It should subsequently encompass areas the place additional adjustments are nonetheless wanted by a trade contractor. Such examples embody using library gadgets slightly than particular MEP trade contractor procured parts which may be used within the model. The creation of a 3D BIM model at this stage by the advisor can also be topic to a number of architectural and structural model adjustments. These have a knock-on impact on the MEP resolution as it’s successfully a work-in-progress model for MEP with fixed architectural and structural adjustments and subsequently won’t ever have the identical stage of effectivity, by way of structure of services, in comparison with an MEP model the place the architectural and structural fashions are frozen. The draw back of this workflow technique is after all the additional time taken to create a BIM model by the advisor crew. Added to this difficulty is the truth that 3D modelling experience and abilities inside a consulting engineering crew can typically be restricted. As soon as the advisor completes his model and passes it to the MEP contractor, the choice as as to whether the contractor ought to adapt the model or begin the modelling course of from the beginning is actually primarily based on the standard of the model to begin with. In reality each eventualities will exist, in some circumstances the MEP trade contractor is best off beginning the BIM model once more utilizing solely the 2D design drawings which are created by the advisor from his BIM model, whereas in some uncommon circumstances the trade contractor will use the consultants MEP BIM model and adapt and modify it together with his adjustments, to make the model prepared for set up. In each eventualities, the MEP contractor will at all times look to make worth engineering additions and adjustments to the model in addition to procurement led model adjustments.

Designers 3D BIM MEP Design and Coordination

The third MEP design workflow technique is a extra pure and direct consequence of BIM and it truly additionally begins to advertise the good thing about BIM extra considerably because it will get nearer to ‘virtual design and building’ goals of the business. On this workflow the method of design engineer is to create a BIM model that’s spatially coordinated and that’s utilizing the precise specified parts for the venture. Usually, the advisor throughout this part can have an extended time period to create the model, permitting him to soak up the adjustments from structural and architectural disciplines as they progress by way of the detailing phases. The truth that the model is then coordinated with the construction and structure in addition to different MEP services permits the advisor to create a model that’s being created in response to an set up normal that’s now extra usable by an installer or fabricator. When the model on this workflow technique is handed on to a contractor, the contractor should still want to make ultimate adjustments and changes in a spherical of worth engineering. Usually, the contractor will use the identical model on this workflow and make adjustments to the model supplied by the MEP design advisor. Moreover, it’s possible that the advisor engineer won’t have supplied invert (top) ranges or dimensions from gridlines and partitions for the MEP services on his drawings. In such circumstances the contractor will subsequently must create extra element within the drawings, however once more contractor might use the advisor’s drawings and progress them in additional element for his/her use architectural drafting.

Contractor 3D Design and Coordination

The fourth workflow technique includes MEP contractors (or trade contractors) taking over the design accountability in addition to the coordination accountability. While the coordination accountability is a longtime skillset with expertise of creating detailed and complete vertical and horizontal methods for coordination being a part of the contractor’s core abilities, the design accountability is a brand new ingredient for the contractor. This was historically referred to as a design and construct method; nevertheless, it’s now turning into more and more frequent particularly in circumstances the place firms are in search of to have speedy design and detailed coordination accomplished. Usually, the parts for use might be specified by the tip consumer, permitting the contractor to design and model earlier than creating his detailed coordinated drawings from the model, to permit set up and fabrication if wanted. The rationale that this specific workflow technique is just not the preferred at current is solely because of the quantity of labor out there and likewise the design accountability that additionally must be assumed as typically, contractors might not want to settle for this threat or certainly they could not have the sources to finish the design work. For this workflow technique to exist in any respect signifies that the contractor has to make use of design employees immediately and supply design legal responsibility insurance to permit him to design the MEP resolution in addition to set up it. The good thing about this workflow choice is clearly the time effectivity that’s realized and subsequently the price profit, as the price of utilising contractor useful resource will often be decrease in comparison with costly design engineering corporations. Nonetheless, it does include some threat because the design experience that design engineers possess can’t be simply replicated by contractors, even when they do make use of in-house groups.

Normal Contractor 3D Model Coordination

The fifth variant of MEP design workflow is predicated on creating coordinated MEP fashions just like the standard 2D to 3D method however for a distinct buyer group. On this workflow technique a 2D architectural, structural and MEP design that’s for use by a foremost contractor (or common contractor) is then progressed right into a 3D BIM model by the contractor to evaluate the validity and completeness of the model. In some circumstances, a number of the design parts from the totally different disciplines could also be introduced in 3D whereas others could also be in 2D. It is usually potential that totally different disciplines might present fashions in several software program that will or might not current software program interoperability challenges. In such cases, a crew will usually be employed to make use of the design knowledge from architectural, structural and MEP designers to then create a 3D BIM model primarily based on precise knowledge. The goal is to determine any inconsistencies within the design knowledge by figuring out any clashes within the model, permitting the contractor in such a workflow technique to successfully mitigate his/her potential threat. Any issues discovered throughout the model are often handed again to the designers to make amendments to their 2D design for subsequent adjustments to the 3D BIM model which is finally owned by the primary contractor. This BIM workflow resolution is turning into much less frequent now as a result of MEP contractors and designers are creating BIM fashions themselves.

In abstract, BIM has launched plenty of new workflow variants to the MEP design services sector. The beforehand tried and trusted technique of a 2D design, from a designer, that was developed right into a 3D coordinated MEP model by contractor is not the workflow resolution used as corporations now have many different variants and alternate options accessible. Together with BIM Modeling, different developments within the building sector, together with collaborative online working and work sharing have additionally contributed to the uptake ranges for BIM and impacted the adjustments to workflow.

When it comes to the MEP design workflow choices, the preferred of those as we transfer ahead would be the third choice, which is the advisor making a BIM model that’s spatially coordinated, or the fourth choice which is the contractor taking over the design accountability in addition to creating the coordinated BIM model. Each choices are successfully a change to the standard method for MEP design and each level to a single supply for the model and drawings versus the historic two-tier design method. All choices mentioned would require competent BIM coordination and MEP modelling groups and sources. XS CAD, with its giant MEP coordination crew and MEP engineering design crew, which consists of mechanical and electrical engineering professionals, is properly positioned to cope with such initiatives for firms primarily based within the USA, UK, Canada, Australia and New Zealand. As all are areas the place BIM is now the popular resolution, XS CAD, with greater than 16 years’ expertise and a presence in every market is a perfect choice for such firms.